Phase 2026 · 31.12.2026
Workplaces and campuses
500+ employees (2026), 200+ (2027), 100+ (2028)
Scope
Workplaces (including public bodies) with 500 or more employees on the same campus at the same time are in scope by the end of 2026. The threshold drops to 200 in 2027 and 100 in 2028. At least one device per 1,000 employees or one per 50,000 m² of campus area.
Minimum device rule
At least 1 per 1,000 employees; campus area is assessed separately
2026 Deadline: 31.12.2026 + 2027 phase+ 2028 phase
Priority locations
- Production area
- Canteen
- Security office and entrances
EXACT COUNT
Clarify the scope for your facility
Share your facility type and size; we will contact you with the right solution.
This page summarises the relevant line in the guide. Consult the Ministry and competent authorities for a final assessment.
Related scope pages
Airports 2026
At least 1 + 1 per 10,000 m² + at least 1 per floor Passenger aircraft 2026
At least 1 per aircraft Stadiums and sports venues 2026
At least 1 + 1 per 5,000 m² + 1 per 10,000 stadium seats + 1 per stand Fitness gyms 2026
Single floor: at least 1 · Multi-floor above 2,000 m²: at least 2