REGULATION · TIMELINE · SCOPE
OED regulation hub
The Regulation, the Ministry guide and the OED-Net process in one place. Every factual section links to its official source; the official text prevails.
Why now?
The Regulation was published on 9 December 2025 and entered into force on 1 January 2026. The guide brings the first mandatory locations into scope by 31 December 2026, starting with high-footfall sites such as shopping malls, airports, workplaces with 500+ employees and facilities with 500+ beds.
What does the Regulation require from a device?
- Portable, fully automatic device that analyses heart rhythm through pads and identifies shockable rhythms.
- Registered as a medical device in the Ministry’s Product Tracking System (ÜTS).
- Voice prompts in at least Turkish and English.
- Ability to transmit readiness, periodic test, battery, movement, location and ECG data to OED-Net.
- Supply from a company holding a medical device sales centre certificate, with a ÜTS unit notification.
Kaynak: Yönetmelik m.5, m.8; OED Rehberi bölüm 2.2 ve 3.1.
Scope and phases
Location categories and minimum device formulas from the guide. The same facility can meet different thresholds at different stages.
| Location / facility | Phase | Minimum rule |
|---|---|---|
| Shopping malls | 2026 | At least 1 per 10,000 m²; at least 1 below 10,000 m² |
| Event venues | 2026 | At least 1 per 1,000 participants |
| Fitness gyms | 2026 | Single floor: at least 1 · Multi-floor above 2,000 m²: at least 2 |
| Airports | 2026 | At least 1 + 1 per 10,000 m² + at least 1 per floor |
| Workplaces and campuses | 2026 | At least 1 per 1,000 employees; campus area is assessed separately |
| City squares | 2026 | At least 1 per 50,000 m² |
| Hotels and student dormitories | 2026 | 2026: 1 per 500 beds · 2027: at least 1 per facility |
| Rail stations, terminals and trains | 2026 | Terminal: at least 1 + 1 per 10,000 m² + 1 per floor · Train: 1 per train · Station: at least 1 |
| Stadiums and sports venues | 2026 | At least 1 + 1 per 5,000 m² + 1 per 10,000 stadium seats + 1 per stand |
| Intercity bus terminals | 2026 | At least 1 + 1 per 50 platforms + 1 per 20,000 m² |
| Passenger ships | 2026 | At least 1 per vessel |
| Passenger aircraft | 2026 | At least 1 per aircraft |
| Large places of worship | 2027 | At least 1 per 10,000 m² |
| TOHM and SEM centres | 2027 | At least 1 per centre |
| Fuel stations | 2028 | At least 1 per station |
EXACT COUNT
Let us clarify your facility’s scope together.
Share your facility type, area and use; we will clarify your phase and the number of devices required.
Sector pages
Thresholds, formulas and priority locations by facility type.
Clarify the scope for your facility
Use the calculator or leave the form and we will get back to you.