Türkiye OED regulation information

TÜRKİYE · OED REGULATION · 2026

The OED requirement starts in 2026.

Türkiye’s Regulation on Portable Automated Shock Devices entered into force on 1 January 2026. The Ministry of Health Guide phases the first mandatory locations up to 31 December 2026. Clarify where your facility sits and how many devices it needs.

Sources: Official Gazette, 09.12.2025, No. 33102 · Ministry of Health OED Guide, 17.04.2026. This content is not legal advice.

Days to the first deadline

37 days

31 December 2026 · 23:59 (TRT)

2026 First phase 31.12.2026
2027 Second phase 31.12.2027
2028 Third phase 31.12.2028
3 phases in the mandatory timeline
12 location categories in scope by end-2026
30 days to register with OED-Net
3 minutes: maximum access time

TIMELINE

Three dates. One question: is your facility in scope?

The guide phases the scope by end-2026, end-2027 and end-2028. The same facility can meet different thresholds at different stages.

2027 31.12.2027
Second phase 5 categories

Smaller facilities

Accommodation and dorms with 100+ beds, workplaces with 200+ employees, large places of worship, sports venues above 5,000 m²/1,000 seats, TOHM/SEM.

2028 31.12.2028
Third phase 2 categories

Broad network

Fuel stations and workplaces with 100+ employees.

SCOPE MAP

Which facility, which threshold, how many devices?

The table summarises the minimum device formulas in the guide. The line for your facility type applies.

Location / facility Phase Threshold Minimum device rule
Shopping malls 2026 Malls with sales area above 5,000 m² At least 1 per 10,000 m²; at least 1 below 10,000 m²
Event venues 2026 Events with 1,000+ participants At least 1 per 1,000 participants
Fitness gyms 2026 Gyms above 800 m² licensed area Single floor: at least 1 · Multi-floor above 2,000 m²: at least 2
Airports 2026 Passenger service areas At least 1 + 1 per 10,000 m² + at least 1 per floor
Workplaces and campuses 2026 500+ employees (2026), 200+ (2027), 100+ (2028) At least 1 per 1,000 employees; campus area is assessed separately
City squares 2026 Central squares designated by metropolitan municipalities At least 1 per 50,000 m²
Hotels and student dormitories 2026 500+ beds (2026), 100+ beds (2027) 2026: 1 per 500 beds · 2027: at least 1 per facility
Rail stations, terminals and trains 2026 Passenger rail transport Terminal: at least 1 + 1 per 10,000 m² + 1 per floor · Train: 1 per train · Station: at least 1
Stadiums and sports venues 2026 Above 10,000 m² / 10,000 seats (2026); above 5,000 m² / 1,000 seats (2027) At least 1 + 1 per 5,000 m² + 1 per 10,000 stadium seats + 1 per stand
Intercity bus terminals 2026 Terminals in provincial centres and districts of 100,000+ population At least 1 + 1 per 50 platforms + 1 per 20,000 m²
Passenger ships 2026 Vessels carrying 100+ passengers At least 1 per vessel
Passenger aircraft 2026 Aircraft carrying passengers At least 1 per aircraft
Large places of worship 2027 Central places of worship of 10,000 m² and above At least 1 per 10,000 m²
TOHM and SEM centres 2027 Olympic preparation and athlete training centres At least 1 per centre
Fuel stations 2028 All fuel stations At least 1 per station

Source: OED Guide (17.04.2026), section 3.1. This table is a summary.

All scope pages →

CALCULATOR

How many OED devices are required?

Select your facility type and enter a few numbers. The calculator applies the guide’s formulas and shows the minimum count and deadline.

Example: a 25,000 m² airport terminal on four floors needs 3 devices by area and 4 by floor rule; the minimum is 4.

QUICK REFERENCE

Shopping mall
1 per 10,000 m²
Airport
1 per 10,000 m² + per floor
Workplace 500+
1 per 1,000 employees
Hotel 500+ beds
1 per 500 beds
Event 1,000+
1 per 1,000 participants
Fuel station
1 per station

PROCESS

Buying the device is not the end.

Registration, placement, maintenance and readiness are part of the same chain. The sequence follows the Regulation and the guide.

01

Determine the scope

Use facility type, licensed area, simultaneous employees/beds/seats/participants and floor count to identify the applicable guide line.

02

Plan the placement

Assess 3-minute access, visibility, signage and cabinet requirements together. Do not skip the special floor rules for airports and rail terminals.

03

Buy from an authorised sales centre

Purchase from a company holding a medical device sales centre certificate and confirm the ÜTS unit notification.

04

Register with OED-Net within 30 days

Serial number, placement, location and floor are recorded. Registration runs through the authorised company that supplied the device.

05

Keep it ready for use

Periodic testing, battery and pad status, post-use reconditioning and record keeping are the acquirer’s responsibility.

OED device technical schematic OED ECG ON / OFF Adult Paediatric ECG SHOCK Voice prompt OED
OED device technical schematic OED ECG ON/OFF Adult pad ECG screen Shock button Paediatric pad Voice prompt OED
Technical schematic: not to scale. Not a product image.

DEVICE

The device the regulation expects

The regulation expects a fully automatic device, registered as a medical device in ÜTS, offering at least Turkish and English voice prompts and able to transfer data to OED-Net. Check these requirements against documents before purchase.

Operation
Fully automatic
Registration
Medical device in ÜTS
Voice prompts
Turkish and English
Data
Status, battery, location, ECG to OED-Net

These four headings summarise the device requirements in the OED Guide and the Regulation. Paediatric configuration, IP54, metronome and standby life are covered in the checklist on the device page.

OED-NET

30 days to register.

A purchased OED must be registered with OED-Net within 30 days. The device must be able to transmit readiness, periodic test results, battery level, movement, location and ECG data.

Under the TÜSEB-SBT guide, the process follows a “single point of contact: authorised company” model. The acquirer supplies serial number, placement, location and floor information.

WHAT THE DEVICE REPORTS

Device status
Ready / in use / mobile
Battery
Level and alerts
Movement / location
Alert when moved
Case
Shock and ECG data

OED-Net integration is a manufacturer/importer authorised-company process; confirm it before purchase.

FAQ

Short answers.

See the regulation hub for the detailed summary, sector pages and sources.

Is an OED mandatory?

The Regulation on Portable Automated Shock Devices entered into force on 1 January 2026. The Ministry of Health OED Guide sets out which locations must have a device and by when, in three phases. Your scope depends on facility type, area, employees, beds, seats, participants and location.

How many devices do we need?

The guide gives a separate formula for each category: for example, at least one per 10,000 m² in a shopping mall, and at least one per 1,000 employees at a workplace with 500+ employees; campus area is assessed separately. The calculator applies these formulas; the final number needs Ministry and expert assessment.

Who may supply the device?

Under Article 8(6), an OED must be purchased from a company holding a medical device sales centre authorisation, and the seller must make the unit notification via ÜTS. Check the sales centre certificate and ÜTS status before purchase.

Who registers the device with OED-Net?

A purchased OED must be registered with OED-Net within 30 days. The TÜSEB-SBT guide applies a “single point of contact: authorised company” model: the process runs through the authorised company that supplied the device. The acquirer provides serial number, placement, location and floor information.

Where should the device be placed?

The device must be reachable within 3 minutes, visible and accessible, marked with signage, kept in a protective cabinet and not locked away. In multi-storey buildings the general rule is at least one device per three floors; airports and rail terminals have a stricter “at least one per floor” rule.

CONTACT

A clear starting point for your facility.

Leave the form with your facility type, approximate size and city. We will assess your needs and prepare a quote.

Request a callback

Let us clarify your facility’s scope and the right number of devices. Leave your details and we will get back to you.

5 short fields. Your details are used only for the callback and information.

Your request is passed to the authorised supplier that handles the OED procurement process. Sales and delivery are carried out by the authorised supplier.

Add optional details

Fields marked * are required. Your data is processed only to respond to your request and provide information.

OED

Request a callback

Let us clarify your facility’s scope and the right number of devices. Leave your details and we will get back to you.

Your request is passed to the authorised supplier that handles the OED procurement process. Sales and delivery are carried out by the authorised supplier.

Add optional details

Fields marked * are required. Your data is processed only to respond to your request and provide information.