TÜRKİYE · OED REGULATION · 2026
The OED requirement starts in 2026.
Türkiye’s Regulation on Portable Automated Shock Devices entered into force on 1 January 2026. The Ministry of Health Guide phases the first mandatory locations up to 31 December 2026. Clarify where your facility sits and how many devices it needs.
Days to the first deadline
31 December 2026 · 23:59 (TRT)
TIMELINE
Three dates. One question: is your facility in scope?
The guide phases the scope by end-2026, end-2027 and end-2028. The same facility can meet different thresholds at different stages.
High-footfall locations
Airports, shopping malls, stadiums, workplaces with 500+ employees, 500+ bed facilities and public transport.
Smaller facilities
Accommodation and dorms with 100+ beds, workplaces with 200+ employees, large places of worship, sports venues above 5,000 m²/1,000 seats, TOHM/SEM.
Broad network
Fuel stations and workplaces with 100+ employees.
SCOPE MAP
Which facility, which threshold, how many devices?
The table summarises the minimum device formulas in the guide. The line for your facility type applies.
| Location / facility | Phase | Threshold | Minimum device rule |
|---|---|---|---|
| Shopping malls | 2026 | Malls with sales area above 5,000 m² | At least 1 per 10,000 m²; at least 1 below 10,000 m² |
| Event venues | 2026 | Events with 1,000+ participants | At least 1 per 1,000 participants |
| Fitness gyms | 2026 | Gyms above 800 m² licensed area | Single floor: at least 1 · Multi-floor above 2,000 m²: at least 2 |
| Airports | 2026 | Passenger service areas | At least 1 + 1 per 10,000 m² + at least 1 per floor |
| Workplaces and campuses | 2026 | 500+ employees (2026), 200+ (2027), 100+ (2028) | At least 1 per 1,000 employees; campus area is assessed separately |
| City squares | 2026 | Central squares designated by metropolitan municipalities | At least 1 per 50,000 m² |
| Hotels and student dormitories | 2026 | 500+ beds (2026), 100+ beds (2027) | 2026: 1 per 500 beds · 2027: at least 1 per facility |
| Rail stations, terminals and trains | 2026 | Passenger rail transport | Terminal: at least 1 + 1 per 10,000 m² + 1 per floor · Train: 1 per train · Station: at least 1 |
| Stadiums and sports venues | 2026 | Above 10,000 m² / 10,000 seats (2026); above 5,000 m² / 1,000 seats (2027) | At least 1 + 1 per 5,000 m² + 1 per 10,000 stadium seats + 1 per stand |
| Intercity bus terminals | 2026 | Terminals in provincial centres and districts of 100,000+ population | At least 1 + 1 per 50 platforms + 1 per 20,000 m² |
| Passenger ships | 2026 | Vessels carrying 100+ passengers | At least 1 per vessel |
| Passenger aircraft | 2026 | Aircraft carrying passengers | At least 1 per aircraft |
| Large places of worship | 2027 | Central places of worship of 10,000 m² and above | At least 1 per 10,000 m² |
| TOHM and SEM centres | 2027 | Olympic preparation and athlete training centres | At least 1 per centre |
| Fuel stations | 2028 | All fuel stations | At least 1 per station |
Source: OED Guide (17.04.2026), section 3.1. This table is a summary.
All scope pages →CALCULATOR
How many OED devices are required?
Select your facility type and enter a few numbers. The calculator applies the guide’s formulas and shows the minimum count and deadline.
QUICK REFERENCE
- Shopping mall
- 1 per 10,000 m²
- Airport
- 1 per 10,000 m² + per floor
- Workplace 500+
- 1 per 1,000 employees
- Hotel 500+ beds
- 1 per 500 beds
- Event 1,000+
- 1 per 1,000 participants
- Fuel station
- 1 per station
PROCESS
Buying the device is not the end.
Registration, placement, maintenance and readiness are part of the same chain. The sequence follows the Regulation and the guide.
Determine the scope
Use facility type, licensed area, simultaneous employees/beds/seats/participants and floor count to identify the applicable guide line.
Plan the placement
Assess 3-minute access, visibility, signage and cabinet requirements together. Do not skip the special floor rules for airports and rail terminals.
Buy from an authorised sales centre
Purchase from a company holding a medical device sales centre certificate and confirm the ÜTS unit notification.
Register with OED-Net within 30 days
Serial number, placement, location and floor are recorded. Registration runs through the authorised company that supplied the device.
Keep it ready for use
Periodic testing, battery and pad status, post-use reconditioning and record keeping are the acquirer’s responsibility.
DEVICE
The device the regulation expects
The regulation expects a fully automatic device, registered as a medical device in ÜTS, offering at least Turkish and English voice prompts and able to transfer data to OED-Net. Check these requirements against documents before purchase.
- Operation
- Fully automatic
- Registration
- Medical device in ÜTS
- Voice prompts
- Turkish and English
- Data
- Status, battery, location, ECG to OED-Net
These four headings summarise the device requirements in the OED Guide and the Regulation. Paediatric configuration, IP54, metronome and standby life are covered in the checklist on the device page.
OED-NET
30 days to register.
A purchased OED must be registered with OED-Net within 30 days. The device must be able to transmit readiness, periodic test results, battery level, movement, location and ECG data.
Under the TÜSEB-SBT guide, the process follows a “single point of contact: authorised company” model. The acquirer supplies serial number, placement, location and floor information.
WHAT THE DEVICE REPORTS
- Device status
- Ready / in use / mobile
- Battery
- Level and alerts
- Movement / location
- Alert when moved
- Case
- Shock and ECG data
OED-Net integration is a manufacturer/importer authorised-company process; confirm it before purchase.
Is an OED mandatory?
The Regulation on Portable Automated Shock Devices entered into force on 1 January 2026. The Ministry of Health OED Guide sets out which locations must have a device and by when, in three phases. Your scope depends on facility type, area, employees, beds, seats, participants and location.
How many devices do we need?
The guide gives a separate formula for each category: for example, at least one per 10,000 m² in a shopping mall, and at least one per 1,000 employees at a workplace with 500+ employees; campus area is assessed separately. The calculator applies these formulas; the final number needs Ministry and expert assessment.
Who may supply the device?
Under Article 8(6), an OED must be purchased from a company holding a medical device sales centre authorisation, and the seller must make the unit notification via ÜTS. Check the sales centre certificate and ÜTS status before purchase.
Who registers the device with OED-Net?
A purchased OED must be registered with OED-Net within 30 days. The TÜSEB-SBT guide applies a “single point of contact: authorised company” model: the process runs through the authorised company that supplied the device. The acquirer provides serial number, placement, location and floor information.
Where should the device be placed?
The device must be reachable within 3 minutes, visible and accessible, marked with signage, kept in a protective cabinet and not locked away. In multi-storey buildings the general rule is at least one device per three floors; airports and rail terminals have a stricter “at least one per floor” rule.
CONTACT
A clear starting point for your facility.
Leave the form with your facility type, approximate size and city. We will assess your needs and prepare a quote.
Request a callback
Let us clarify your facility’s scope and the right number of devices. Leave your details and we will get back to you.
5 short fields. Your details are used only for the callback and information.
Your request has been received.
Your details are saved. We will use the number you provided for the callback. In a medical emergency, call 112.