OED timeline: 2026 / 2027 / 2028

Which facility, by when, how many devices? We consolidated the three phases in the Ministry guide into one table. The same facility can meet different thresholds at different stages.

Last updated: 23.11.2026 OED Rehberi · 17.04.2026
First phase 31.12.2026
12 rows

High-footfall locations

Second phase 31.12.2027
5 rows

Smaller facilities

Third phase 31.12.2028
2 rows

Broad network

The same facility can appear in more than one phase: for example, a workplace enters scope at 500+ employees in 2026, 200+ in 2027 and 100+ in 2028.

Days to the first deadline

37 days

31 December 2026 · 23:59 (TRT)

2026 First phase 31.12.2026
2027 Second phase 31.12.2027
2028 Third phase 31.12.2028

First deadline: 31.12.2026

2026 · High-footfall locations

Airports, shopping malls, stadiums, workplaces with 500+ employees, 500+ bed facilities and public transport.

Location / facility Threshold Minimum device rule
Shopping malls Malls with sales area above 5,000 m² At least 1 per 10,000 m²; at least 1 below 10,000 m²
Event venues Events with 1,000+ participants At least 1 per 1,000 participants
Fitness gyms Gyms above 800 m² licensed area Single floor: at least 1 · Multi-floor above 2,000 m²: at least 2
Airports Passenger service areas At least 1 + 1 per 10,000 m² + at least 1 per floor
Workplaces and campuses 500+ employees (2026), 200+ (2027), 100+ (2028) At least 1 per 1,000 employees; campus area is assessed separately
City squares Central squares designated by metropolitan municipalities At least 1 per 50,000 m²
Hotels and student dormitories 500+ beds (2026), 100+ beds (2027) 2026: 1 per 500 beds · 2027: at least 1 per facility
Rail stations, terminals and trains Passenger rail transport Terminal: at least 1 + 1 per 10,000 m² + 1 per floor · Train: 1 per train · Station: at least 1
Stadiums and sports venues Above 10,000 m² / 10,000 seats (2026); above 5,000 m² / 1,000 seats (2027) At least 1 + 1 per 5,000 m² + 1 per 10,000 stadium seats + 1 per stand
Intercity bus terminals Terminals in provincial centres and districts of 100,000+ population At least 1 + 1 per 50 platforms + 1 per 20,000 m²
Passenger ships Vessels carrying 100+ passengers At least 1 per vessel
Passenger aircraft Aircraft carrying passengers At least 1 per aircraft

First deadline: 31.12.2027

2027 · Smaller facilities

Accommodation and dorms with 100+ beds, workplaces with 200+ employees, large places of worship, sports venues above 5,000 m²/1,000 seats, TOHM/SEM.

Location / facility Threshold Minimum device rule
Hotels and student dormitories Facilities above 100 beds; dormitories with 100+ capacity At least 1 per facility
Workplaces and campuses 200+ employees at the same time At least 1 per workplace; campus area is assessed separately
Central large places of worship 10,000 m² and above At least 1 per 10,000 m²
Sports venues, halls and stadiums Above 5,000 m²; stadiums above 1,000 seats At least 1
TOHM and SEM centres Türkiye Olympic Preparation Centres and Athlete Training Centres At least 1 per centre

First deadline: 31.12.2028

2028 · Broad network

Fuel stations and workplaces with 100+ employees.

Location / facility Threshold Minimum device rule
Fuel stations All fuel stations At least 1 per station
Workplaces and campuses 100+ employees at the same time At least 1 per workplace; campus area is assessed separately

Calculate your deadline and device count

This table summarises section 3.1 of the OED Guide (17.04.2026). The line for your facility type applies.

Open the calculator →

OED

Request a callback

Let us clarify your facility’s scope and the right number of devices. Leave your details and we will get back to you.

Your request is passed to the authorised supplier that handles the OED procurement process. Sales and delivery are carried out by the authorised supplier.

Add optional details

Fields marked * are required. Your data is processed only to respond to your request and provide information.